Product Detail :
|
Supply and Stacking of 50 mm Gauge hard and durable machine crushed stone ballast at WASHIM (WHM) Ballast depot and loading the same into Hopper/Traffic ballast wagon by Mechanical means under ADEN/AK's Jurisdiction for Completion Period 18 (Eighteen Months) (Including (03) Three months mobilization period. Similar nature of work (for costing above 50 lakhs) Any Civil Engineering work except zonal maintenance work, consisting of (i) Supply of Machine crushed graded stone aggregates or railway track hallast or (ii) Construction of road with Flexible or Rigid pavement or laying of Granular sub-base (GSB) or (iii) Construction of foundation and substructure or superstructure of major bridges, in concrete.
|