Product Detail :
|
Construction of R.O.B in Lieu of LC.No.485 -Balance left over works on Railway portion - Superstructure of
span No.1 as 1x 25.00 m C/c PSC I Girder with deck slab, Span 2 Composite girder with Steel I girders with
deck slab completed + Span 3 to 5 as 3 x 31.00 m C/C PSC I girder with deck slab, Construction of one left
over pier with bed block and Construction of Approaches (R&B Portion) - 6 x 30.0m PSC Girders on
Chowdavaram side, 6 x 30.0 m PSC Girders on Visakhapatnam side with RE wall on both sides and other
miscellaneous works in lieu of LC No.485 (Laxmi Devi peta gate) at Km.745/16-18 between Bayyavaram
and Anakapalli stations at Anakapalli yard.
|
| Tender Detail : |
Construction of R.O.B in Lieu of LC.No.485 -Balance left over works on Railway portion - Superstructure of
span No.1 as 1x 25.00 m C/c PSC I Girder with deck slab, Span 2 Composite girder with Steel I girders with
deck slab completed + Span 3 to 5 as 3 x 31.00 m C/C PSC I girder with deck slab, Construction of one left
over pier with bed block and Construction of Approaches (R&B Portion) - 6 x 30.0m PSC Girders on
Chowdavaram side, 6 x 30.0 m PSC Girders on Visakhapatnam side with RE wall on both sides and other
miscellaneous works in lieu of LC No.485 (Laxmi Devi peta gate) at Km.745/16-18 between Bayyavaram
and Anakapalli stations at Anakapalli yard. |