Product Detail :
|
Modification of existing 33 kv oh power line track crossings (total 4 nos.) and 11kv plc oh power line track crossings (total 5 nos.) by replacing with htug cable at different locations, at power supply arrangement for colour light signaling in the asm room, lc gate lodges, parallel lines and lt modification works in between tumsar road-tirodi and balaghat-katangi section (group 353&354) of south east central railway under railway electrification project/.
|