|
Product Detail :
|
Group work Bhavnagar Division elimination of 12 Nos Level Crossings by provision
of Road Under Bridges / Limited Height Subways at (1) Dhola- Dhasa section -
Construction of LHS of size 5.00 x 4.50 m at LC No.18 at Km 24/9-25/0 in PRCL
section. (2) Surendranagar - Dhola section Construction of RUB in lieu of Manned
LC No.114 at Km 15/7-8 on PRCL line. (3) Surendranagar-Dhola section -
Construction of LHS of size 5 x 4.50 m at LC No. 128 at Km 32/9-33/0 in PRCL
section. (4) Surendranagar - Dhola section Construction of RUB in lieu of LC
No.148 at Km 58/4-5, LC No.156 at Km 68/8-9 and LC No.159 at Km 73/0-1 on
PRCL line. (Size 1 X 5.00 M X 4.5 M box) (5) Surendranagar -Dhola section
Construction of RUB in lieu of Manned LC No.116, C-class at Km 20/1-2. (6)
Sabarmati-Botad Section - Construction of RUB in lieu of Manned LC No.42, C-class
at Km 34/6-7 (Size 4M X 5M box) (7)Sabarmati-Botad section Construction of RUB
in lieu of Manned LC No.153, B2-class at Km159/9-160/0 (Size 4M X 5M box) (8)
Surendranagar - Dhola section Construction of RUB in lieu of LC No.127 at Km
32/2-3 and LC No.129 at Km 33/9@ 45"47@ 0 on PRCL line. (Size 1 X5.00 M X 4.5
M box) (9) Sabarmati-Botad Section - Construction of RUB in lieu of Manned LC No.
38 C Traffic Interlocked at Km 31/6-7. under Jurisdiction of DEN (East) Bhavnagar.
|
| Tender Detail : |
Group work: Bhavnagar Division elimination of 12 Nos Level Crossings by provision
of Road Under Bridges / Limited Height Subways at (1) Dhola- Dhasa section -
Construction of LHS of size 5.00 x 4.50 m at LC No.18 at Km 24/9-25/0 in PRCL
section. (2) Surendranagar - Dhola section: Construction of RUB in lieu of Manned
LC No.114 at Km 15/7-8 on PRCL line. (3) Surendranagar-Dhola section -
Construction of LHS of size 5 x 4.50 m at LC No. 128 at Km 32/9-33/0 in PRCL
section. (4) Surendranagar - Dhola section: Construction of RUB in lieu of LC
No.148 at Km 58/4-5, LC No.156 at Km 68/8-9 and LC No.159 at Km 73/0-1 on
PRCL line. (Size 1 X 5.00 M X 4.5 M box) (5) Surendranagar -Dhola section:
Construction of RUB in lieu of Manned LC No.116, C-class at Km 20/1-2. (6)
Sabarmati-Botad Section - Construction of RUB in lieu of Manned LC No.42, C-class
at Km 34/6-7 (Size 4M X 5M box) (7)Sabarmati-Botad section Construction of RUB
in lieu of Manned LC No.153, B2-class at Km159/9-160/0 (Size 4M X 5M box) (8)
Surendranagar - Dhola section: Construction of RUB in lieu of LC No.127 at Km
32/2-3 and LC No.129 at Km 33/9@ 45"47@ 0 on PRCL line. (Size 1 X5.00 M X 4.5
M box) (9) Sabarmati-Botad Section - Construction of RUB in lieu of Manned LC No.
38 C Traffic Interlocked at Km 31/6-7. under Jurisdiction of DEN (East) Bhavnagar. |