Product Detail :
|
Construction of 2 lane ROB in lieu of LC No.58 (Manned) at Km95/850 with 1x30m Composite Girder with 23x18.71m PSC girder (Nittur end) + 8x18.71m PSC girder (Harnahalli end) Plus RCC retaining wall (Approach Span) and Construction of limited high sub-way of size 5.5x2.5m between Nittur-Gubbi Stations. Construction of 2 lane ROB in lieu of LC No.46 (Manned) at Km78/340 with 1x42m Bow String Girder in Mallasandra Yard and construction of Limited Height Subway of size 5.5x2.5m between Tumkuru-Mallasandra stations (Composite Work).
|
Tender Detail : |
Construction of 2 lane ROB in lieu of LC No.58 (Manned) at Km:95/850 and Construction of limited high sub-way of size 5.5x2.5m between Nittur-Gubbi Stations. |