Product Detail :
|
Construction of sub-structure & super-structure of major bridge no. 40 (1x45.7m) at km 42.950, 72 (1x45.7m) at km 54.503, 156 (1x45.7m) at km 74.823, 192 (1x45.7m) at km 87.203 and super-structure of bridge no. 105 at km 62.303(1x45.7) and bridge no-168 at km 80.383(3x45.7) in connection with construction of hajipur-sagauli new bg rail line project.
|