|
Product Detail :
|
Construction of Foundation, Substructure and Superstructure of Important Bridge
No. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x
30.50 m OPEN WEB GIRDER Spans, including Pile Foundation and 800 m
Approaches, for Single-Line Railway Track conforming to RDSO 25 T Axle Load
Standard and Substructure designed for 32.5 T Loading over River Barakar
between Barakar and Kumardubi Stations from Km 229/30 to Km 230/16 (F/HWH),
of Eastern Railway
|
| Tender Detail : |
Construction of Foundation, Substructure and Superstructure of Important Bridge
No. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x
30.50 m OPEN WEB GIRDER Spans, including Pile Foundation and 800 m
Approaches, for Single-Line Railway Track conforming to RDSO 25 T Axle Load
Standard and Substructure designed for 32.5 T Loading over River Barakar
between Barakar and Kumardubi Stations from Km 229/30 to Km 230/16 (F/HWH),
of Eastern Railway |