|
Product Detail :
|
Doubling of track between TURAVUR-MARARIKULAM, MARARIKULAM -ALAPUZHA,
ALAPUZHA -AMPALAPUZHA section Proposed Construction of i. Major Bridge No.
EAK-95 at KM 27/100-200 as 1x12.2m PSC slab ii. Major Bridge No. EAK-102 at KM
30/900-31/000 as 1x12.2m PSC-U slab iii. Bridge No. EAK 129 at KM 44/000-100 as
1x9.15m PSC slab between TUVR-MAKM stations iv. Major Bridge No. EAK-152 at
KM 54/200-300 as 3x12.20m PSC slab v. Major Bridge No. EAK-157 at KM 56/000-
100 as 5x9.15m PSC slab between MAKM-ALLP stations vi. Major Bridge No. EAK-
162 at KM 58/800-59/000 as 2x9.15m + 1x12.20m PSC slab vii. Bridge No. EAK-
164 at KM 60/000-100 as 1x9.15m PSC slab viii. Bridge No. EAK-167 at KM 62/400-
500 as 1x9.15m PSC slab between ALLP-AMPA stations.
|
| Tender Detail : |
Doubling of track between TURAVUR-MARARIKULAM, MARARIKULAM -ALAPUZHA,
ALAPUZHA -AMPALAPUZHA section: Proposed Construction of: i. Major Bridge No.
EAK-95 at KM 27/100-200 as 1x12.2m PSC slab ii. Major Bridge No. EAK-102 at KM
30/900-31/000 as 1x12.2m PSC-U slab iii. Bridge No. EAK 129 at KM 44/000-100 as
1x9.15m PSC slab between TUVR-MAKM stations iv. Major Bridge No. EAK-152 at
KM 54/200-300 as 3x12.20m PSC slab v. Major Bridge No. EAK-157 at KM 56/000-
100 as 5x9.15m PSC slab between MAKM-ALLP stations vi. Major Bridge No. EAK-
162 at KM 58/800-59/000 as 2x9.15m + 1x12.20m PSC slab vii. Bridge No. EAK-
164 at KM 60/000-100 as 1x9.15m PSC slab viii. Bridge No. EAK-167 at KM 62/400-
500 as 1x9.15m PSC slab between ALLP-AMPA stations. |