Inquiry For Liaison Service
Sector abcRailways Transport ServicesTender ValueN.A.
LocationUttar Pradesh - India Ref.No71354205
Closing Date08 - May - 2024
Supply of s.s.glass ink golden yellow in packing of one (1) kg.confirming followingexperimental and required standards for acceptance/ rejections of s.s.glassink on the basis of practical tests. (i) covering capacity ink must havesufficient covering capacity so that the surface does not remain visible afterapplicationof one coat in screen printing. (ii) brightness it must have sufficientbrightness so that letter are clearly visible on panel. a letter of size 150 mmfrom a distance of 25 metre and a letter of size 50 mm from a distance of 10metre must be clearly visible to eyes of a healthy person. (iii) consistencyink should be in the form of paste and must pass through 80 no. nylo boltcloth during screen printing. (iv) fluidity it may be easily spread over screenby screwjee during screen printing but should not flow after printing. (v) drying time it must have at least 30 minuts drying time so that five or morecoaches can be printed after applying on screen . after printing on panel itmust be tack free in 40 - 45 minutes and completely dry in 60-75 minutes. (vi) washability - it should be possible to clean ink left over on screen by kerosene oil.
s.s.glass ink golden yellow in packing of one (1) kg.confirming followingexperimental and required standards for acceptance/ rejections of s.s.glassink on the basis of practical tests. (i) covering capacity ink must havesufficient covering capacity so that the surface does not remain visible afterapplicationof one coat in screen printing. (ii) brightness it must have sufficientbrightness so that letter are clearly visible on panel. a letter of size 150 mmfrom a distance of 25 metre and a letter of size 50 mm from a distance of 10metre must be clearly visible to eyes of a healthy person. (iii) consistencyink should be in the form of paste and must pass through 80no. nylo boltcloth during screen printing. (iv) fluidity it may be easily spread over screenby screwjee during screen printing but should not flow after printing. (v) drying time it must have at least 30 minuts drying time so thatfive or morecoaches can be printed after applying on screen . after printing on panel itmust be tack free in 40 - 45minutes and completely dry in 60-75 minutes. (vi) washability - it should be possible to clean ink left over on screen by kerosene oil. [ warranty period 30 months after the date of delivery ]
If you are a new user, then please register, it's Free and then fill the form below.

If you are registered with us, just fill the form below, we will get back to you shortly.


All fileds marked with '*' are compulsary.
Email Id : *
Comments: *
 Login/Register
Members/Visitors Login to continue
 Email Id:
 Password:


 Forgot Password?
 Tenders by Industry
Skip Navigation Links.
Expand Transport Equipments TendersTransport Equipments Tenders
Expand Transport Services          TendersTransport Services Tenders
more  »
Tenders by Ownership
Central Government/Public Sector Tenders
Co-operatives Tenders
Corporations/ Associations/ Others Tenders
Education & Research Institutes Tenders
Joint Sector Tenders
Non classified Tenders
Private Sector Tenders
Research Institutes Tenders
State Government Tenders
Trust Tenders
 Tenders by State in India
Andhra Pradesh Tenders
Delhi Tenders
Gujarat Tenders
Madhya Pradesh Tenders
Maharashtra Tenders
Rajasthan Tenders
Tamil Nadu Tenders
Uttar Pradesh Tenders
West Bengal Tenders
more  »