Product Detail :
|
Podnur-shoranur section- 1. ttr (tws/cs+cmsc) on points and crossings and derailing switch 26 sets, 1 in 12 -14 sets (tws+cmsc),1 in 8.5- 4sets (cs +cmsc), 1 in 16-1 set(cs+cmsc) and derailing switch (trap) 7 sets (detailed location at annexure). 2.shoranur-nilambur section increasing sleeper density for a total length of 3.375 km from km 1310 nos to 1540 nos /km in various yards between shoranur-nilambur section (location as per annexure).
|
Tender Detail : |
Podnur-shoranur Section- 1. Ttr (tws/cs+cmsc) on Points And...... |