Product Detail :
|
Detailed design consultancy services for corridor 1 from sarthana dead end (ch -450m) to end of ug ramp (ch 3950m), elevated viaduct, elevated station (4 stations) including viaduct portion within the stations and transition spans on either side of the stations” and (ii) detailed design consultancy services for corridor 2 from dead end (ch -949.63m) to saroli dead end (ch 17791.9m), elevated viaduct, elevated station (18 stations) including viaduct portion within the stations and transition spans on either side of the stations & depot at bhesan” in connection with surat metro rail project, phase – i.
|