Product Detail :
|
Running civil maintenance of bg railway track from ktps to hirodih connection, a captive railway system including waiting bay, loops, sidings, positive mgr, negative mgr, fuel oil siding lying inside plant area of ktps and allied works at dvc, ktps.
|