Product Detail :
|
Supply of design, manufacture, supply, installation, testing & commissioning of zero speed integrated trackmonitoring system (zitms) (inclusive of warranty of 24 months after successful commissioning),& training of irpersonnel. supply of labour and consumables service cost of operation of zero speed integrated track monitoringsystem (zitms) during warranty period of 24 months after commissioning of each machine. (per machineunit)as per operation & maintenance conditions given in para 13.0 part-ii section-c of tender document.at (location) zonal railways as per tender conditions 4.00 numbers3 3 service(y)non stock --- yes consignee inr supply of service cost of post warranty operation & maintenance of zero speed integrated track monitoringsystem (zitms) for 60 months. (per machine unit) as per details of operation and maintenance given in para14.0 of part-ii section-c of tender document.at (location) zonal railways as per tender conditions 4.00 numbers4 4 goods (y) non stock --- yes consignee inr +any 1 material cost of all required spares & consumables per machine for operation & maintenance ofzero speed integrated track monitoring system (zitms) for 60 months (considering the yearly recording of30000 kms) as per para 14.0 of part-ii, section-c of tender document (post warranty) supply of material cost of all required spares & consumables per machine for operation & maintenance ofzero speed integrated track monitoring system (zitms) for 60 months (considering the yearly recording of30000 kms) as per para 14.0 of part-ii, section-c of tender document (post warranty)
|