Product Detail :
|
Srivilliputtur station proposed raising of existing low level platform no.1 1 & 2 to high level platform. * proposed repairs to existing road surfaces at manned level crossings between tiruchchirappalli- manamadurai section-34 lcs (list enclosed). * complete track renewal (primary of exg. 52 kg (90 uts) rails on 52 kg psc sleepers of m8/m+7 density with new 60kg 190 uts)rails over 60kg psc sleepers of m8 density fora length of 8.000kms from km. 565.215 to 565.670 & 566,000 to 569.000 in virudunagar pway section and km 615.450 to 618.000,638.302 to 638.386. 638.424 to 638 523. 639.111 to 639.222, 639.260 to 639.311 including bye- pass line between km0 000 to 0.730 in tuticorin pway section and between km0.300 to 1.300 in srivaigundam p.way section (manual laying -2.075 loms & laying with pors/sors-6005kms). * senior section engineer/works / sengottai section proposed raising of existing low level platform no. 1 & 2 at pambakovil shandy & kikollur and platform no.2 at auvaneeswarem & kundara station to high level platform. * transportation facilities. hiring of tata sumo similar vehicle - 1 no for a period of two years for supervising the works for divisional engineer/south/. * collection and supply of 50 mm machine crushed stone ballast at oddanchatram depot to meet out the deficiency in main line between km 20.900 to 120.000 in between stations akkaraippatti & pollachchi in senior section engineer / p.way / palani section. * senior section engineer / works / tirunelveli section proposed raising of existing low level platform no 2 at kadambur, 1 & 2 at sriva gundam & arumuganeri and 2 & 3 at tiruchendur stations to high level platform. * tiruchchirappalli - rameswaram section proposed through weld renewal using mobile flash butt welding under line block between km 406.800 to 427.000 in pudukkottai permanent way section & km599.000 to 610.000 in mandapam permanent way section for a length of 31 200 kms in between stations tiruchchirappalli & ramanathapuram rdso approved agencies only have to offer their rates). * senior section engineer/works/dindigul section proposed raising of existing low level platform no.1 at pungudi, kulathur, ayyalur and tamaraipadi station to high level platform. * tiruchchirappalli-dindigul (downline) section complete track renewal (primary) for a length of 12.340 kms by using pors/sors train between km -367.380 to 375.590 and km 400.700 to 404.830 (excluding detour portion) in between stations kulathur & ayyalur in manaparai permanent way station. * senior section engineer / works/karaikudi section proposed raising of existing low level platform no. 1 at devakottal road, platform no 1.28 3 at kallal, melakonnakulam & mandapam and platform no 2 & 3 at sivagangaito high level platform. * senior section engineer/works / karaikudi section proposed raising of existing low level platform no. 1 & 2 at kumaramangalam, keeranur, vellanur and platform no. 2 & 3 at chettinad to high level platform. * econditioning of cms crossings in silu at various station yards in senior section engineer / p.way / sengottai and punalur sections. * raising the height of retaining wall / compound wall at tirunelveli construction of sewage canal, cc pathway, raising height of sewage canal wall/compound wall at tuticorin. * tirunelveli sub division regulation of control valves for supplying water to staff qrs, station and service buildings for a period of two years. * provision of waiting hall, toilet and urinals. * providing house keeping & hospitality services for officers' rest house (5 suites for a period of 24 months. * construction of type ii ors-4 units. * provision of dewatered concrete in left over area of platform no 4. * provision of platform shelter 2 bays in pf no.1. * construction of one glr with pipeline arrangements. * construction of side drain, raising of exg. side drains and construction of cement concrete protective walls at km 690/600-700, 691/300-400 and at vulnerable locations at km694/700-800, 701/700-800, 704/760-800 & 705_000- 050 in between stations new aryankavu & edaman.
|