Product Detail :
|
Work of assembling, laying and linking of railway track for main lines and loops lines with contractor’s own p-way materials (except rails sleepers and ballast) on spur liune4 between gharghoda (km1.315) and bhalumuda (km 14.425) section, construction of concrete surfacing over loading platforms at chhal, dharamjaygarh and bhalumuda yards and supply, fabrication and fixing of steel structure for pathway / ladder / inspection platform over already constructed major bridges in connection with construction of new BG electrified double rail line from kharsia (km 0) to dharamjaygarh (km 74.00) including spur line from gharghoda to bhulumuda in the state of Chhattisgarh over south east central railway.
|