Product Detail :
|
Construction of single line bg cut & cover tunnels (total length 600rm (approx.)) in between ch. 10.300 km and ch. 13.800 km at isolated stretches & underground twin tunnel (app. length 160rm) at km 23.360 to km 25.520, including all other ancillary works in between stations bairabi and mualkhang, in connection with construction of new bg railway line from bairabi-sairang (mizoram).
|